Sign in Subscribe

Design Review Board approves six applications, advancing library renovation and residential project.

Design Review Board · Meeting of January 21, 2026

WELLESLEY — Design Review Board approves six applications, advancing library renovation and housing project. The board unanimously cleared signage and minor construction for Clarendon Fine Art at 25 Central Street, approved a parking lot and front-entrance renovation at the Wellesley Free Library (530 Washington Street) that will address ongoing water damage, and cleared two Beacon Bank sign replacements at 35 and 448 Washington Street. Chair Juann Khoory and the full board unanimously approved the 592 Washington Street residential project featuring 19 units, 38 parking spaces in an underground garage, and resident amenities; the approval included eight recommendations on facade restoration, window treatments, and delivery-access coordination after a neighbor raised concerns about trucks backing onto Washington Street.

In the full story:

  • The complete report — 471 words

Source: the Design Review Board meeting of January 21, 2026, reported from the official video recording and transcript.

Keep reading with a 14-day free trial

Subscribe to Wellesley News to keep reading this post and get 14 days of free access to the full post archives.

Already have an account? Sign in. Ask about this instead

A subscription gets you:

  • Subscriber-only posts and full archive
  • Post comments and join the community
  • 24x7 access to local news

Subscribe to Wellesley News

Don’t miss out on the latest issues. Sign up now to get access to the library of members-only issues.
jamie@example.com
Subscribe