Natural Resources Commission reviews Morses Pond design at 50 percent schematic
WELLESLEY -- May 28, 2026, Wellesley NRC reviews 50-percent schematic design for Morses Pond beach overhaul. Recreation Director Ainsley Martin urged commissioners not to treat the project as a bathhouse swap, saying it is meant "to reinvigorate the whole area" around the town's drinking-water source. The design team presented asphalt pathways, engineered wood fiber playground surfacing, retaining seat walls, and a fully accessible route to the docks, with the existing pavilion retained and a new one added. Arborist Hartney Greymont rated trees across the site; four flagged for removal are in good health, prompting pushback from members. A contemplated NRC–DPW land swap remains unapproved by the legislature, attorney general and MWRA. No votes were taken.
Members read the rest of this story and every Wellesley meeting we cover, in full.
Become a memberAlready a member? Sign inA 30-day free trial needs a payment method. After it, your membership renews at the price shown at checkout until you cancel, which you can do anytime from your account. Subscription terms
Share this story
Know someone in Wellesley who follows town government? Share Townbrief Wellesley: they can sign up free.